
Using the Line Configuration Web User Interface
228 FG-750
Performing an Injection Loss Test
Performing an Injection Loss Test
The injection loss test is used to confirm that your switches are properly
connected. The test can be performed on one or several ports at a same
time.
To perform an injection loss test:
1. From the Line Management section, select which lines you want to
test. To quickly select or deselect all entries, use the check box in the
list header.
2. Click Test Selected Ports.
IMPORTANT
The injection lost test results are not persistent. They will be erased
if you exit the application, or refresh your window.
Kommentare zu diesen Handbüchern